CASE ARCHIVE

COMPLETED PROJECTS

Detailed field write-ups outlining asset diagnostics, concrete remediation, joint repairs, and protective coating systems across Western Australia.

Dalecoast concrete rehabilitation works at Bridge 4378A, Hopeland Road
Concrete patch repairs and reinforcement treatment on culvert bridge
Waterproofing and erosion protection works on bridge structure
BRIDGE REHABILITATIONBridge MaintenanceConcrete RepairsWaterproofing

Bridge 4378A — Hopeland Road

Location:Hopeland Road over Dirk Brook, Shire of Serpentine Jarrahdale
Asset Type:MRWA Reinforced Concrete Culvert Bridge
Services:Concrete Repairs, Guard Rail Repair, Waterproofing and Earth Works

Dalecoast delivered rehabilitation works at Bridge 4378A on Hopeland Road over Dirk Brook. The project addressed deteriorated concrete, localised erosion, moisture exposure and associated defects affecting the reinforced concrete structure.

The scope included concrete patch repairs, reinforcement treatment, joint remediation, erosion protection, Earth Works and waterproofing. Controlled repair methods were used to reinstate concrete cover and improve the structure's resistance to moisture and deterioration.

Dalecoast marine bridge remediation works at Bridge 5328, Port Coogee
Concrete spalling repairs on marine bridge structure
Protective coating application in marine environment
MARINE BRIDGE REMEDIATIONBridge MaintenanceConcrete RepairsProtective Coatings

MARABOO WHARF — PORT COOGEE

Location:Maraboo Wharf, Port Coogee, City of Cockburn
Asset Type:Marine Bridge
Services:Concrete Repairs and Protective Coatings

Dalecoast completed concrete remediation and protective coating works at Bridge 5328 on Maraboo Wharf at Port Coogee. The coastal location required durable repair and coating systems suitable for ongoing marine exposure.

The works addressed concrete spalling, reinforcement corrosion and deterioration affecting bridge elements. Repair areas were prepared and reinstated before protective coatings were applied to reduce moisture and chloride ingress.

Dalecoast laser surface preparation and protective coating works on Windan Bridge
Protective coating system application to major bridge steelwork
Aerial view of major road bridge coating works
BRIDGE PROTECTIVE COATINGSBridge MaintenanceProtective CoatingsLaser Cleaning

Windan Bridge — Protective Coatings and Laser Preparation

Location:Perth, Western Australia
Asset Type:MRWA Bridge
Services:Laser Surface Preparation, Painting and Protective Coatings

Dalecoast was engaged as a specialist subcontractor to Fortec to deliver painting and protective coating works on Windan Bridge. The project required controlled preparation and coating operations on major bridge infrastructure.

The scope incorporated specialist laser surface preparation together with the application of protective coating systems. Dalecoast supplied experienced personnel, equipment and project controls to support safe delivery and coating quality.

Dalecoast concrete repairs at Hester Avenue underpass, UP9166, Wanneroo
Epoxy crack injection and joint remediation on underpass structure
Headwall repair works on reinforced concrete underpass
UNDERPASS REMEDIATIONBridge MaintenanceConcrete RepairsInfrastructure

UP9166 — Hester Avenue Underpass

Location:Hester Avenue, City of Wanneroo
Asset Type:MRWA Concrete Underpass
Services:Concrete Repairs, Crack Injection and Joint Remediation

Dalecoast delivered remediation works at UP9166, the Hester Avenue underpass in the City of Wanneroo. The project addressed deteriorated concrete, exposed reinforcement, cracking and joint defects affecting the structure.

The scope incorporated concrete reinstatement, reinforcement treatment, epoxy crack injection, joint resealing and headwall repairs. The works were completed using controlled preparation methods and documented inspections.

Dalecoast protective coating works on bridge steelwork at Victoria Park Drive
Surface preparation of bridge steelwork before coating
Corrosion protection coating system applied to bridge steel elements
PROTECTIVE COATINGSBridge MaintenanceProtective CoatingsInfrastructure

BR9211A — Victoria Park Drive

Location:Victoria Park Drive, Western Australia
Asset Type:Bridge Steelwork
Services:Concrete Repairs, Surface Preparation and Protective Coatings

Dalecoast delivered concrete repairs, protective treatment and repainting works to the bridge structure as part of the Victoria Park Drive Rectification project. The coating system was applied to improve corrosion protection and extend the service life of exposed steel elements.

The works incorporated surface preparation, corrosion treatment, protective primers, intermediate coatings and durable finishing coats. Environmental conditions, coating intervals and dry-film thickness were monitored through the project inspection and test process.

Technicians performing concrete remediation on bridge pier at Fremantle Ports
Abrasive blasting preparation on structural steel at Fremantle Ports
Application of protective anti-carbonation coating at Fremantle Ports
PROTECTIVE COATINGProtective CoatingsAbrasive BlastingMarine

Fremantle Ports — Berths B & C

Location:Fremantle Ports, Berths B & C, Western Australia
Asset Type:Ports
Services:Abrasive Blasting and Protective Coatings

Dalecoast delivered protective coating works to structural stringers at Fremantle Ports Berths B & C, including abrasive sweep blasting to achieve the specified surface condition, followed by application of a high-performance three-coat protective coating system.

Works were completed under controlled conditions with strict adherence to the project specification, including environmental monitoring, surface preparation standards, coating intervals and QA/QC inspections to ensure long-term corrosion protection in the aggressive marine environment.

Swan River Bridge Structural Concrete Remediation and Sub-surface Restoration
Industrial Protective Coating Application on Steel Bridge Structures
Swan River Bridge Structural Concrete Remediation and Sub-surface Restoration
BRIDGE PROTECTIVE COATINGSBridge MaintenanceProtective CoatingsAbrasive Blasting

Swan River Causeway Bridge — Abrasive Blast & Paint

Location:Swan River, Western Australia
Asset Type:Primary Corridor Bridge
Services:Abrasive Blasting and Protective Coatings

Dalecoast was engaged to deliver a major abrasive blasting and protective coating program across Bridges BR914 and BR932 on the Swan River Causeway, comprising approximately 22,000m² of structural steelwork. The project required mobilisation of barges and purpose-built encapsulation systems to provide safe access beneath the bridge and contain blasting and coating operations over the Swan River.

Steelwork was progressively abrasive blasted and recoated with a protective coating system, with works carefully staged to maintain environmental controls, quality requirements and ongoing bridge operations throughout the project. Operating under rigorous safety and quality management frameworks, Dalecoast restored structural integrity while maintaining full operational continuity for surrounding maritime vessel pathways and key arterial road transport.

Concrete column surface preparation and repairs at Nedlands Shopping Centre
CFRP strengthening system applied to structural column at Nedlands Shopping Centre
Completed CFRP-strengthened column with protective skim coat finish at Nedlands Shopping Centre
Discuss a Similar Project
CFRP STRENGTHENINGCarbon Fibre StrengtheningConcrete Repairs

Nedlands Shopping Centre – CFRP Column Strengthening

Location:Nedlands, Western Australia
Asset Type:Shopping Centre – Structural Columns
Services:Concrete Repairs, Crack Repairs and CFRP Strengthening

Dalecoast completed concrete remediation and carbon fibre reinforced polymer strengthening works to structural columns at Nedlands Shopping Centre. The works were carefully staged to restore the affected concrete and provide additional structural reinforcement while operating within an active commercial environment.

The columns were thoroughly prepared before all cracks and areas of concrete spalling were repaired. Once a sound and correctly profiled substrate had been established, the specified CFRP system was applied to strengthen the structural elements. A skim coat was then installed over the completed reinforcement to provide a uniform, protected finish. The completed works restored the damaged concrete and strengthened the columns using a high-performance CFRP system. The final skim coat provided a clean and consistent surface while protecting the completed reinforcement.