Infrastructure
Maintenance &
Remediation.
Concrete repairs, protective coatings, carbon-fibre strengthening, and structural maintenance for bridges, ports, utilities, and mining assets across Western Australia.
Infrastructure remediation at scale.
Scope records, site methodologies, and timeline benchmarks from recent bridge, processing plant, and port wharf remediation projects delivered by Dalecoast engineering crews.
ABRASIVE BLAST AND PROTECTIVE COATING
Protective coating works to structural stringers at Fremantle Ports Berths B & C included abrasive sweep blasting to achieve the specified surface condition, followed by application of a high-performance three-coat protective coating system. Works were completed under controlled conditions with strict adherence to the project specification, including environmental monitoring, surface preparation standards, coating intervals and QA/QC inspections to ensure long-term corrosion protection in the aggressive marine environment.
- Asset typePorts
- ServicesAbrasive blasting & coatings
- Timeline14 days




SWAN RIVER Causeway bridge abrasive blast & paint
Dalecoast was engaged to deliver a major abrasive blasting and protective coating program across Bridges BR914 and BR932 on the Swan River Causeway, comprising approximately 22,000m² of structural steelwork. The project required mobilisation of barges and purpose-built encapsulation systems to provide safe access beneath the bridge and contain blasting and coating operations over the Swan River. Steelwork was progressively abrasive blasted and recoated with a protective coating system, with works carefully staged to maintain environmental controls, quality requirements and ongoing bridge operations throughout the project.
Operating under rigorous safety and quality management frameworks, Dalecoast restored structural integrity while maintaining full operational continuity for surrounding maritime vessel pathways and key arterial road transport.
PROJECT SPECIFICATIONS & SCOPE
Asset Type
Primary Corridor Bridge
Services Delivered
Abrasive Blasting & Protective Coatings
Location
Swan River, Western Australia
Timeline
12 Months
COMPLIANCE
ISO 9001 Certified Quality Systems
Key Outcome
+25 Year Design Life Extension


22,000 m²
Coating Surface
100%
QA Compliance
0 Days
Downtime